SHARAD ENGINEERING PVT. LTD.

EPC of EHV Transmission Lines and Substations.

Building Sustainable Energy & Infrastructure

Modern, innovative, and 100 percent employee-owned construction company delivering quality civil, electrical, and solar solutions.

About Our Company

SHARAD ENGINEERING PVT. LTD. is a construction company that is modern, innovative, and 100 percent employee-owned. We build projects in collaborative team environments, using innovative techniques to improve productivity, reduce costs, and give clients the best project possible.


Our company has shown its presence through its dedicated and quality services in the field of civil construction works, manpower, solar projects, substation work, transmission line erection, mechanical, and electrical work. The management is vested in professional hands, led by a Managing Director who is a professionally qualified engineer with considerable experience in project execution.

Our Quality Services

Solar Services

Solar Power Projects

  • Solar Foundation Work: Cabling structure foundation work offered at reasonable prices.
  • Installation of Solar PV Modules: Expert installation and maintenance ensuring modules capture proper sunlight.
  • Solar Lighting Work: High-quality lighting works finished in a timely manner.
Substation Work

Substation Work

  • Civil and Erection Work: Foundation, installation, and commissioning of switchyard equipment for efficient power distribution.
  • Equipment Testing: Ensuring safety and operational reliability of all substation components.
Transmission Line Work

Transmission Line

  • Erection & Installation: Supply and installation of high voltage 132 KV and 220 KV transmission lines.
  • Route Survey & Tower Foundation: Complete EPC services for reliable power transmission networks.
Electrical Work

Electrical Work

  • Laying of Underground Cable: 11 KV, 33 KV, and 132 KV cable laying handled by skilled workers.
  • Control Panels: Construction and installation of control panels.
  • Cable Trenching: Constructing cable trenches in substations.
Civil Construction

Civil Construction

  • Staff Quarters: Constructing staff quarters beside substations.
  • Boundary Wall: High-quality boundary walls for substations and solar panels.
  • Construction of Roads: Roads, highways, and pathways using advanced machines.

Work Experiences

100 MW MAHAGENCO Solar Power Plant Project

Currently executing a 220 KV substation with an associated 220 KV transmission line (13.56 km) for a 100 MW MAHAGENCO Solar power plant located at village Udapur, Tal-Narkhed, Dist-Nagpur.

  • EPC of 220 KV Substation: Located at village - Udapur. Reliable & robust infrastructure.
  • EPC of 220 KV Transmission Line (13.56 KM): From Udapur (Nagpur) to LILO village Udapur (Amravati).
Solar Power Project High Tension Transmission Lines

Our Completed & Ongoing Projects

Sr. No. Customer Name & Contact person Project Name & Work Order Ref. & Date Max. Rating (132Kv/220 Kv Switchyard & Transmission Line) Transmission line Route In Kms. Project Location Details of completed Job
1 Gammon (Power Grid) Gammon15//12/2016 (Power Grid) 400 KV 8 KM Dist.-Wardha, State-Maharashtra. Successful Completed In 2017
2 Neha Construction (MSETCL) Neha/22//2017 (Amravati Division) 220 KV 12 KM Dist.-Akola, State-Maharashtra. Completed in 2018
3 Neha Construction (MSETCL) Neha/4/5/2017 (Nagpur Division) 220 KV 6 KM Dist.-Chandrapur, State-Maharashtra. Completed in 2019
4 MSETCL with Amitasha Enterprises Pvt.Ltd. CE/EHV/CCO & M/Zone/Amt/Tech/No. 089 (Amravati Division) 220 KV 14.65 (KM) Dist.-Amravati, State-Maharashtra. Completed in 2020
5 MSETCL with Amitasha Enterprises Pvt.Ltd. (Contact person- Mr. Wankhede-7058728969) AEPL/960/2019/520 Dated-23-07-2019. (Amravati Division) 132 KV 25 KM Dist.-Amravati, State-Maharashtra. Completed in 2020
6 MSETCL with Amitasha Enterprises Pvt.Ltd. (Contact Person- Mr. Wankhede- 7058728969) AEPL/676-07/20-21/227 Dated-05-07-2020. (Nagpur Division) 132 KV 2 KM Dist.-Nagpur, State-Maharashtra. Completed in 2021
7 MSETCL (Kolhapur Division) (Contact Person-Mr. Rajesh Shinde-8411001703) SE/EHVPC/KOP/TECH/T- 01R/SUPPLY/20-21/No.- 858 Dated-28-10-20 132 KV 2.5 KM Dist.-Kolhapur, State-Maharashtra. Completed in 2022
8 Sharayu Power Engineers (With TATA Solar Power) (Nagpur Division) SPE/TATA-Sharad/Jkheda- TL/PO-01 Dated-23-08-2021 132KV 0.5 KM Dist.-Nagpur, State-Maharashtra. Completed in 2022
9 MSETCL (Nagpur Division) (Contact Person- Mr. Konge- 8554998115) S.Ε.Ε.H.V./O&M/CIR/HR/F &A/TECH/No.-2183 Dated- 01/10/2021 132KV 7.5 KM Dist.-Nagpur, State-Maharashtra. Completed in 2022
10 Phoenix Pvt. Ltd. (Nagpur Division) Contact person- Mr. Varun Patil-9922430043) PSEPL/SM/21-22/Erection- Commissioning/MSETCL/U -N/137 220 KV 15 KM Dist.-Chandrapur, State-Maharashtra. Completed In 2024.
11 Rounak Industries Pvt. Ltd. (Contact Person-Mr. Sandip Mukharjee- 8830517241) 220 Kv Gadchandur S/ to Dalmia Cement Factory 220 Kv 12 Km. Dist.-Yavtamal, State-Maharashtra. Completed in 2023
12 Maha-active Engineers India Pvt. Ltd (Contact person-Mr. Paras - 7588774876.) 132 Kv Karajgaon Line 132Kv 16.6Km Dist.-Amravati, State-Maharashtra. Completed in 2024.
13 Maharashtra Generation Co. MSETCL/Bonadada Engineering 220 kv 13.5 Kms Dist.- Nagpur, State - Maharashtra Completed In 2025.
14 Adani Power Projects MSETCL/Adani 220 Kv 3.5 Kms Dist. - Amravati, State - Maharashtra Work Under Progress
15 MSETCL/TATA Projects MSETCL / TATA Projects 220 Kv 52 Kms Dist. - Nagpur, State - Maharashtra Work Under Progress

Our Valued Clients

MSETCL

Maharashtra State Electricity Transmission Co.

BONDADA ENGINEERING

Hyderabad, Telangana

KPI GREEN ENERGY

Surat, Gujarat

MAHAGENCO

Koradi Thermal Power Plant,
Nagpur, Maharashtra

SAFETY FIRST: All Accidents are Preventable

Our brief Health, Safety & Environment Policy is to provide a safe and healthy workplace for all employees and ensure that operations are carried out in a manner that protects the environment and community in general.

  • Promoting a positive culture based on improving our HSE performance.
  • Complying with all applicable HSE legislation.
  • Identifying and eliminating/controlling hazards and pollution.
  • Providing training for employees to maintain the HSE system.

Our Manpower & Equipments

Team Members

S. No Description Qty
01Engineer01
02Supervisor02
03HSE Manager01
04Massion05
05Weldor02
06Machine Operator05
07Skilled Labour10
08Unskilled Labour20
09Electrician06
10Driver04
11Office Boy01

Machinery Owned/Leased

S. No Description Qty
01Hydra01
02JCB02
03Dumper02
04Hitechi01
05Scarpio/ Bolero Camper04
06Tractor with trolly04
07Vibrator Roller01
08Welding Machine01
09Drill Machine02
10Mixer machine02
11Loader/Forcleep02

Board of Directors

Sharad Takbhaure

Sharad Takbhaure

Director

Mob: 9860307835

Email: sharadtakbhaure@sepl.com

Mangesh Joge

Mangesh Joge

Director

Mob: 7821046923

Email: mangeshjoge@sepl.com

Raju Jagtap

Raju Jagtap

Director

Mob: 7972969920

Email: rajujagtap@sepl.com